WORK OF EXTENSION OF HARBOUR LINES….MAJOR BLOCK OF 9 HOURS ON DOWN SLOW LINE AT JOGESHWARI STATION ON 30th APRIL, 2017

A 9 hours major block will be taken o­n Down slow line at Jogeshwari station from 07.00 hrs to 16.00 hrs o­n Sunday, 30th April, 2017 by Mumbai Rail Vikas Corporation in connection with Harbour line extension work. During the block, Down slow line trains will be run o­n Down fast line between Andheri & Goregaon and will not halt at Ram Mandir for want of platform.

          All Down fast trains of Dahanu Road/Virar/Vasai Road/Bhayander/ Borivali/Malad running fast between Andheri & Borivali will take additional halt at Jogeshwari PF No.3 except 15-car train & Goregaon locals from 30/04/2017 to 7/05/2017.

          In case of any unusual o­n Down fast line, if Down fast trains are diverted o­n Down slow line, in such case Down fast trains will NOT halt at Jogeshwari station.

          From 30/04/2017 to 7/05/2017, all trains running of Down slow line will skip halt at Jogeshwari due to non-availability of platform. Passengers are allowed to travel in Up direction from Ram Mandir to Jogeshwari o­n same ticket or pass.

     Due to the block, some local trains will remain cancelled, the list of which will be available at all stations.

Leave a comment