Traffic / Power Block will be imposed between Bharatnagar and Sanathnagar Stations on Secunderabad-Wadi section of Secunderabad of SCR during the months of February, March and April, 2015 for three hours from 12:15 pm to 15:15 pm on the following dates for facilitating works related to crossing of Metro Rail over SCR track. The details of trains cancelled / partially cancelled / regulated due the line block are as follows:-
The traffic / power block will be imposed on the following dates (Tuesdays & Saturdays only) in order to minimize the dislocation of passenger services on the section.
Month
|
Day
|
Dates
|
|||
February-15
|
Tuesday
|
03-02-15
|
24-02-15
|
—
|
—
|
Saturday
|
07-02-15
|
14-02-15
|
21-02-15
|
28-02-15
|
|
March-15
|
Tuesday
|
03-03-15
|
10-03-15
|
17-03-15
|
—
|
Saturday
|
07-03-15
|
14-03-15
|
21-03-15
|
—
|
|
April-15
|
Tuesday
|
07-04-15
|
14-04-15
|
—
|
—
|
1) Cancellations of Passenger Trains: (on the above mentioned Dates)
(i)T.No.57606 Vikarabad-Kacheguda Passenger
(ii)T.No.57518 Tandur-Hyderabad Passenger
(iii)T.No.57517 Hyderabad-Tandur Passenger
(iv) T.No.57605 Secunderabad-Vikarabad Passenger.
2) Cancellation of MMTS Sub-urban Trains:(on the above mentioned Dates)
(i)T.No.47137 Lingampalli-Hyderabad MMTS
(ii) T.No.47138 Lingampalli-Hyderabad MMTS
(iii) T.No.47139 Lingampalli-Hyderabad MMTS
(iv) T.No.47189 Lingampalli-Falaknuma MMTS
(v) T.No.47180 Lingampalli-Falaknuma MMTS
(vi) T.No.47181 Lingampalli-Falaknuma MMTS
(vii) T.No.47215 Lingampalli-Falaknuma MMTS
(viii) T.No.47182 Lingampalli-Falaknuma MMTS
(ix) T.No.47183 Lingampalli-Falaknuma MMTS
(x) T.No.47185 Lingampalli-Falaknuma MMTS
(xi) T.No.47110 Hyderabad-Lingampalli MMTS
(xii) T.No.47111 Hyderabad-Lingampalli MMTS
(xiii) T.No.47112 Hyderabad-Lingampalli MMTS
(xiv) T.No.47113 Hyderabad-Lingampalli MMTS
(xv)T.No.47115 Falaknuma-Secunderabad MMTS
(xvi) T.No.47198 Falaknuma – Lingampalli MMTS
(xvii) T.No.47214 Falaknuma – Lingampalli MMTS
(xviii)T.No.47158 Falaknuma – Lingampalli MMTS
(xix)T.No.47169 Falaknuma – Lingampalli MMTS
(xx)T.No.47160. Falaknuma – Lingampalli MMTS
3) Trains Rescheduled/Regulated: ( on the above mentioned Dates)
(1) T.No.12748 Vikarabad-Guntur Palnadu Exp Sch.dep.13.45 hrs will be rescheduled by 45 minutes i.e at 14.30hrs from Vikarabad.
(2) T.No.18519 Visakhapatnam-Lokmanya Tilak Terminus Express will be regulated between Kondapalli – Secunderabad for 90 mts on Secunderabad Division.
(3) T.No.12702 Hyderabad-Mumbai Hussain Sagar Express will be regulated between Hyderabad-Sanathnagar by 10 minutes on Secunderabad Division.
(4) T.No.47184 Lingampalli-Faluknuma MMTS (Sch. Departure. 14.50 hrs) will be regulated between Lingampalli-Bharatnagar by 9 minutes.
4) Partial Cancellation of Trains:(on the above mentioned dates)
a) T.No.47200 Falaknuma -Hyderabad MMTS (Dep. 14.15 hrs) will be partially cancelled between Secunderabad and Hyderabad.
b) T.No.12025 Pune-Secunderabad Shatabdi Express will be short terminated at Lingampalli. on these days, service will be partially cancelled between Lingampalli and Secunderabad.
5) Partial Cancellation of Secunderabad-Pune Shatabdi Express
T.No.12026 Secunderabad-Pune Shatabdi Exp. will start from Lingampalli on Saturdays as per Schedule at 15:15 hrs from Lingampalli. The days of partial cancellation between Secunderabad and Lingampalli are as follows:
Month
|
Day
|
Dates
|
|||
February-15
|
Saturday
|
07-02-15
|
14-02-15
|
21-02-15
|
28-02-15
|
March-15
|
Saturday
|
07-03-15
|
14-03-15
|
21-03-15
|
—
|
Speed restriction of 20, 30 and 50 kmph at the location during the above work will be imposed as per the requirement.